the implementation
Starting from the architectural idea, we developed a construction project that met the needs of the customer and the context, solving the area’s main critical issues.
In order to speed up assembly operations, the bridge was divided into 3 segments of approximately 50 tonnes, which were entirely manufactured in our Verona factory.
The possibility that the Elsa River might flood made it necessary to provide for rainwater and river drainage, a condition solved by our construction project.
In order to be durable and create a pleasant impact on the surroundings, we choose to use corten steel supplied by our company, which is also qualified to weld this material. The three segments were transported to the site with exceptional transport organised by our company, allowing the assembly team involved to receive the components in sequence and successfully complete the work.